My Quote (0 total item(s))
My Quote

Currently your quote basket is empty.

If you would like us to quote you a price for any product(s) please select your product(s), quantity required and then follow the on screen instructions to receive a quote.

    Get My Quote Continue Browsing

    Armstrong Ceilings follow the curve at Police Motorway HQ

    24th May 2012

    Ceiling systems engineered by Armstrong Atelier and supplied by Nevill Long Birmingham feature on a motorway policing office.

    Metal and mineral systems from Armstrong Ceilings were specified for a new Central Motorway Police Group HQ for their market-leading reputation, proven track record and comprehensive product portfolio.

    Some 260m² of Armstrong’s RH 215 metal micro-perforated planks with a factory-applied acoustic fleece were used on the first floor to follow the curve of the shallow barrel vault roof, while a total of more than 600m² of Ultima dB and OP mineral tiles with a variety of edge details and acoustic properties were used on the ground floor.

    The project incorporated the refurbishment of an existing garage block, with the steel-frame, rainscreen-clad build. The Armstrong Ceilings, which feature Sound Absorption Class up to A, were installed throughout over two months.

    The Central Motorway Police Group provides a fully-regionalised policing service for the motorways of the West Midlands, West Mercia and Staffordshire force areas. It is responsible for patrolling the Midlands motorway network, stretching south from Cheshire on the M6 to the Welsh borders on the M50.

    For more information on Nevill Long's Armstrong product offering click here.